How to Ensure Compliance with Part L: Practical Steps for Builders
A practical checklist for meeting the Part L photographic evidence requirement: what to photograph, when to photograph it, and how to keep the record defensible across every plot.

Compliance with Part L is not just a legal requirement — it is what stands between a finished plot and an issued EPC. This is a practical guide to meeting it, aimed at the people actually running sites.
Start before you break ground
The photographic requirement is far easier to meet if it is planned rather than retrofitted.
- Get the detail list per plot type. Work from Appendix B of Approved Document L and your own construction details. Most sites have a handful of plot types, so the list is reusable.
- Map details to build stages. Each photograph has a window — foundation edge insulation can only be captured before the slab goes down.
- Name a responsible person per site. Consistency matters more than seniority.
- Agree the handover with your SAP assessor early. Knowing what format they want avoids rework at the end.
What to photograph
As a working checklist, for every plot:
- Foundations and ground floor — insulation at foundation edges and ground floor perimeters; external door thresholds
- Walls — insulation continuity at floor-to-wall junctions; structural penetrations through external walls; window and door reveals
- Roof — insulation at roof edges, eaves and changes in level
- Airtightness — the sealing details delivering the tested air permeability
- Services — heating, hot water and ventilation plant, labelled and identifiable
One photograph per unique detail, plus close-ups wherever a detail needs clarity.
Make each image defensible
An image that cannot be tied to a plot, a date and a location is not evidence. Each photograph should carry:
- Geolocation — so it can be tied to the right plot
- A date and time stamp — so it can be tied to the right stage
- A clear subject — the detail should be identifiable without a caption
The common failure modes
Most sites do not fail because nobody took photographs. They fail because:
- Images live in a camera roll or a WhatsApp group and cannot be found later
- Nobody can tell which plots are complete and which are not
- A detail was covered up before anyone photographed it
- The person who had the photos has left
Each of these is a process problem, not a regulatory one.
Keep a live view of what is outstanding
The single most useful thing you can do is make the gap visible. If the person responsible can see, at any point, which details are captured and which are not across every plot, missed photographs stop being a discovery made at handover.
That is what AutoBREL does: a checklist per plot, automatic tagging on capture, and a dashboard showing exactly what is left.
More from AutoBREL

The Role of Technology in Modern Construction Compliance
Compliance has shifted from paperwork at the end to evidence captured as you build. A look at the tools changing how sites meet Part L and the regulations around it.
Read article
The Benefits of Photographic Evidence in Construction
Beyond Part L compliance, a good photographic record protects against disputes, improves quality control and gives you a defensible account of what was built.
Read article
Why a Purpose-Built App Beats WhatsApp and Email for BREL Evidence
Most sites collect Part L photographic evidence through WhatsApp groups, email chains and a shared drive. Here is what that costs, and what changes when the tool is built for the requirement.
Read article